Projects
Historic Renovation
Chicago, Illinois
Mark Twain Hotel
Historic preservation and renovation of a 5-story apartment building with a basement, originally built ca. 1929. A total of 151 single-room-occupancy dwelling units were renovated into 148 units. Building amenities include a parlor, laundry room, public toilet room, management office, common kitchen, roof deck, and a manned front desk.
- Services Provided: Review of construction documents and construction-monitoring services
- Construction costs: $18 MM
- Duration: 12 months
Indianapolis, Indiana
Bottleworks Hotel
Historic preservation and renovation of a 2-story building originally constructed for the Coca Cola Company in 1930, with additions in 1940 and 1946. The building was adapted for service as a hotel with 138 guestrooms, a restaurant and bar, meeting spaces, a large conference room, a fitness center, and back-of-house offices and service areas. Commercial/ retail space is provided at the 1st floor.
- Services Provided: Review of construction documents and construction-monitoring services
- Construction costs: $56 MM
- Duration: 21 months
Rochester, New York
St. Bernard’s Park
Historic preservation and moderate renovation of a multi-building former seminary complex, previously adaptively reused and renovated into affordable senior apartments with 160 units.
- Service Provided: Review of construction documents and performance of construction
- Construction costs: $16 MM
- Duration: 18 months
Toledo, Ohio
Fort Industry Square
Adaptive re-use and gut rehabilitation of existing historic office buildings, consisting of ten 4- and 5-story connected structures reportedly built at various times in the 19th century. Renovation provides 87 residential apartments, as well as commercial tenant space at portions of the basement and 1st and 2nd floors.
- Services Provided: Review of construction documents and construction-monitoring services
- Construction costs: $19 MM
- Duration: 26 months
Washington, DC
Spring Flats Senior
Adaptive re-use and substantial renovation of the former Hebrew Home for the Aged in the Petworth neighborhood of northwest Washington, DC.
- Service Provided: Review of construction documents and performance of construction
- Construction costs: $18 MM
- Duration: 18 months